State approvals / Assam / Pollution Control Board Assam

Application for Consent to Establish under the Air (prevention and control of pollution act, 1981) & Water (prevention and control of pollution act, 1974)

DepartmentPollution Control Board Assam
TypeNew
StagePre-Establishment
Time limit30 days 40 days 70 days 100 days 120 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Land documents such as Sale deed, Jamabandi, Type Map, Non-encumbrance Certificate and Revenue Clearance Certificate of the proposed plot.( if the plot is rented/lease hold then in addition to the above documents Rent deed/ Lease deed should be submitted) or Allotment letter of designated authority for the site of project If located in the designated industrial area/ industrial estate If applicable
2 Project Report containing the detailed Environment Management Plan — Required
3 Site plan prepared by Competent Engineer — Required
4 Layout plan showing location of the — Required
5 Units/Stack/Chimney/Emission points — Required
6 Drainage and final disposal for liquid effluent — Required
7 Solid waste collection/storage/disposal facility — Required
8 demarcation of open area in the industry premises and green belt within the compound with dimensions — Required
9 Non-agricultural land certificate from circle officer If the land is classified as agriculture land If applicable
10 Copy of article and memorandum of Association/Partnership deed/deed of Attorney (except Proprietorship Firm — Required
11 Registration Certificate of DICC — Required
12 Consent fees in favour of Member Secretary, Pollution Control Board, Assam payable through online banking/credit card/debit card, based on the investment of the project as per latest notification — Required
13 Environmental Clearance Certificate(EC) if the proposed industry is required to obtain prior EC from MoEF & CC/SEIAA as per EIA Notification 2006 in force — Required
14 Copy of details of the planning permission obtained from the local body / Town and Country Planning authority / metropolitan development authority / designate authority — Required
15 If the site is situated in notified industrial estate, copy of details of proposed arrangement — Required
16 Description of process of manufacture for each of the products showing input, output, quality and quantity of solid, liquid and gaseous wastes If any from each unit process. (To be supported by flow sheet and / or material balance and water balance sheet If applicable
17 Copy of water budget calculations accounting for difference between water consumption and effluent generated — Required
18 A schematic diagram of the treatment scheme of trade effluent with inlet / outlet characteristics of each unit operation / process including details of residue management system (ETP sludges) — Required
19 A location map of disposal arrangement of treated effluents indicating the outlet(s) for sampling — Required
20 Effluent Analysis report in case of Consent under Water Act and Ambient Air Quality monitoring report In case of Consent under Air Act If applicable
21 Attach specifications including residue management systems of each of the control equipment indicating inlet / outlet concentrations of relevant pollutants — Required
22 Analysis report of treated effluent gas emissions and process emissions from the approved laboratory by State Board / Central Board / Central Government in the Ministry of Environment and Forests — Required
23 Analysis report of characteristics of the hazardous waste(s) and concentration of relevant pollutants from the approved laboratory by State Board / Central Board / Central Government in the Ministry of Environment and Forests — Required
24 Enclose documentary proof and copies of agreement of quantity of hazardous waste disposed — Required
25 Capital and recurring (O & M) expenditure on various aspects of environment protection such as effluent, emission ,hazardous waste, solid waste, tree plantation, monitoring, date acquisition etc. (give figures separately for items implemented / to be implemented) — Required
26 Brief details of tree plantation / green belt development within applicant's premises (in hectares) — Required
27 Information of schemes for waste minimisation, resource recovery and recycling - implemented and to be implemented, separately — Required
28 If the industry comes under Public Hearing, enclose relevant documents such as EIA, EMP, Risk Analysis etc — Required
29 CA's Certificate regarding updated capital investment in the project including land, Ambient Air Quality monitoring report In case of Consent under Water and Air Act If applicable