State approvals / Delhi / Delhi Pollution Control Committee (DPCC)
Consent to Operate under the Air (Prevention and Control of Pollution) Act, 1981) & Water Act (Prevention and Control of Pollution) Act, 1974
This approval is for obtaining Consent to Operate from the Delhi Pollution Control Committee under the Air and Water Pollution Control Acts. It ensures that the unit operates in compliance with environmental regulations for managing air and water pollution.
DepartmentDelhi Pollution Control Committee (DPCC)
TypeNew
StagePre-Establishment
Time limit120 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Undertaking in prescribed format duly signed by the applicant | — | Required |
| 2 | Certificate from Chartered Accountant (w.r.t. column 5 of consent form) | — | Required |
| 3 | Manufacturing Process in Detail with flow chart | — | Required |
| 4 | List of raw materials used, product manufactured and byproducts generated during the process with maximum quantity per day | — | Required |
| 5 | Noise Monitoring Report of D.G. Set | If applicable, not more than six month old | If applicable |
| 6 | ETP/ STP effluent analysis report not more than six month old | If applicable | If applicable |
| 7 | Stack monitoring report(s) not more than six month old | If applicable | If applicable |
| 8 | Proof of CETP Membership in the name & address of unit | If CETP exists | If applicable |
| 9 | Copy of the electricity/ power bill of the connection being used by the applicant | — | Required |
| 10 | Copy of Water Connection | In case of Municipal Supply | If applicable |
| 11 | PAN Card of the Industrial Unit/Proprietor/HCU issued by Income Tax department except Govt. Owned / PSU Agencies | — | Required |
| 12 | Original authorization letter except | In case of individual proprietary concern | If applicable |
| 13 | Copy of CGWA/DJB/DC Permission/ Registration | If applicable | If applicable |
| 14 | SSI / MSME Registration Certificate | If applicable | If applicable |
| 15 | Proof of conformity with the provisions of Master Plan of Delhi from the concerned authority/local body shall be taken. OR Relevant provision in the Master Plan showing conformity of the activity shall be taken. • - a) Approved Layout Plan (from Oil Companies) b) Allotment letter/dealership with one of the four National Oil Companies i.e. Indian Oil Company, Hindustan Petroleum, Bharat Petroleum and IBP c) Letter from Oil Company stating that dealership agreement is valid as on date. d) Proof of conformity with the provisions of Master Plan of Delhi from the concerned authority/local body shall be taken. OR Relevant provision in the Master Plan showing conformity of the activity shall be taken | In case of Petrol Pump cum Service Station | If applicable |
| 16 | If the unit is falling in the industrial area earmarked for redevelopment under MPD 2021 | In case of Petrol Pump cum Service Station | If applicable |
| 17 | Any one of the documents as proof of date of establishment prior to 07.02.2007 as specified in the office order dated 19.6.2013 shall be taken | In case of Petrol Pump cum Service Station | If applicable |
| 18 | License issued by MCD/ NDMC/ DCB/ Local Bodies in the name of unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
| 19 | Sale Tax/ VAT/ TIN Registration in the name of unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
| 20 | Income tax return of the unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
| 21 | Land Line telephone bill in the name of unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
| 22 | Power sanction letter/ bill in the name of unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
| 23 | Water sanction letter/ bill in the name of unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
| 24 | Sanction Building Plan from Local Bodies/ Land Owning Agencies in the name of unit | In case of Petrol Pump cum Service Station | If applicable |
| 25 | Completion certificate from Local Bodies/ Land Owning Agencies in the name of unit | In case of Petrol Pump cum Service Station | If applicable |
| 26 | In case of rented premises, an undertaking from the landlord indicating date of first lease/ rent agreement to the unit with a copy of the lease/ rent agreement | In case of Petrol Pump cum Service Station | If applicable |
| 27 | Any other document/ license/ notice/ letter issued by the Statutory Authority to the unit/ applicant | In case of Petrol Pump cum Service Station | If applicable |
More from Delhi Pollution Control Committee (DPCC)
- Authorization for import of Ferrous & non-ferrous scrap under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016
- Authorization under Battery Waste Management Rules, 2020
- Authorization under Bio-Medical Waste Management (Management and Handling) Rules, 2016
- Authorization under Construction and Demolition Waste Management (Management and Handling) Rules, 2016
- Authorization under Solid Waste Management (processing, recycling, treatment, and disposal of solid waste) Rules, 2016
- Authorization under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016
- Consent to Establish under the Air (Prevention and Control of Pollution) Act, 1981 & Water (Prevention and Control of Pollution) Act, 1974