Insights into Company Bills & Payments

State approvals / Haryana / Urban & Local Bodies

Occupation or Completion Certificate (Form BR-IVB)

DepartmentUrban & Local Bodies
TypeNew
StageOperation / Renewal
Time limit11 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Application on prescribed from BR-IV. 2.Name of the applicant/ company 3.Date of CLU 4.Area in sqmt/acres 5.validity of CLU. 6.Structural certificate on prescribed BR-V (1) for a height upto 14.50 meters and form BR- V (2) for height above 14.50 meters alongwith copy of qualification/ degree of the certificate engineer. 7.Scrutiny fees @ RS.10/- sq.mt. of the total built up area. 8.Labour Cess @ 10/- sqft for RCC and Rs. 450/- sqft for shed on total built up area. 9.No dues certificate regarding labour cess. 10.Approval of building plan verification of service laid down at site. 11.Compliance of CLU conditions. 12.Status of payment of EDC. 13.Status of development works carried out at site alongwith photographs and video CD/DVD. 14.Public Health Services Plan. 15.Approval from any others authorities as required. 16.NOC from MoEF, if built area is more than 20,000 sqm. 17.NoC regarding fire safety 18.NoC from HAREA regarding installation of Solar water heating system, if applicable. 19.Acess permission taken from XEN, or NHAI, if the site abuts on schedule road or NH. 20.As built drawing duly singed by Owner and Architect. 2.Name of the applicant/ company 3.Date of CLU 4.Area in sqmt/acres 5.validity of CLU. 6.Structural certificate on prescribed BR-V (1) for a height upto 14.50 meters and form BR- V (2) for height above 14.50 meters alongwith copy of qualification/ degree of the certificate engineer. 7.Scrutiny fees @ RS.10/- sq.mt. of the total built up area. 8.Labour Cess @ 10/- sqft for RCC and Rs. 450/- sqft for shed on total built up area. 9.No dues certificate regarding labour cess. 10.Approval of building plan verification of service laid down at site. 11.Compliance of CLU conditions. 12.Status of payment of EDC. 13.Status of development works carried out at site alongwith photographs and video CD/DVD. 14.Public Health Services Plan. 15.Approval from any others authorities As required. 16.NOC from MoEF, if built area is more than 20,000 sqm. 17.NoC regarding fire safety 18.NoC from HAREA regarding installation of Solar water heating system, if applicable. 19.Acess permission taken from XEN, or NHAI, if the site abuts on schedule road or NH. 20.As built drawing duly singed by Owner and Architect If applicable

More from Urban & Local Bodies