State approvals / Himachal Pradesh / Himachal Pradesh State Pollution Control Board
Consent to Establish under HPPCB AIR Act,1981, WATER Act,1974
This approval is required by an industry to establish its operations under Water & Air (Prevention & Control of Provision) Act.
DepartmentHimachal Pradesh State Pollution Control Board
TypeNew
StagePre-Establishment
Time limit15 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | NOC Performa & Form I and/or Form XIII each in triplicate under Air Act, 1981 and Water Act, 1974 as may be applicable to the unit duly filled up. The Performa can be obtained from the Boards Head Office as well as from the nearest Regional Offices on payment. Project Report of the proposed industry duly approved and accepted by the GM Industries Department and Provisional Registration Certificate issued by the Industries Department or by State Level Single Window Clearance & Monitoring Authority. Clearance of proposed Site by the State Level Site Appraisal Committee headed by the Labour Commissioner, if the proposal is covered under the provisions of Indian Factories Act Clearance of Joint Inspection Committee in respect stone crushers and Provisional Registration and Mining Lease/ Permission, in case of forest land there must be approval under Forest Conservation Act. NOC from the Panchayat or the Local Body concerned under jurisdiction of which the proposed unit shall be located. NOC from the Town & Country Planning Department if the proposed location is outside approved Industrial Area/Estate within a Planning Area. Detailed manufacturing process along with flow chart of various operations to be carried out, type of raw materials, details of plant & machinery, material & water balances, Chemical Safety Data Sheet for each chemical to be used in the process, total investment proposed in the project and the estimated outlay earmarked for pollution control measures. Engineering designs & drawings of the proposed pollution control measures for treatment and control of wastewater, emissions and solid waste. OnSite & OffSite Emergency Plans in case the proposed industry fall in the ambit of Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989. Site Plan showing the location of the proposed industry and physical, features like streams, villages, towns and distance from the nearest link road and main road including human habitation, detailed layout plan showing manufacturing units, water supply and waste lines, location of treatment units/ air pollution control equipment and solid waste disposal site. In case of hydro power units site plan of muck dumping site. Consent Fee as prescribed according to the Rules. Environmental Impact Assessment (EIA) Report and Environmental Management Plan (EMP) with prescribed fee for public hearing (Annexure-III) only in respect of projects requiring Environmental Clearance from Govt. of India as per notification No.SO1533 (E) dated 14092006 Environmental Public Hearing is mandatory in cases requiring Environmental Clearance from Government of India | — | Required |