Insights into Company Bills & Payments

State approvals / Maharashtra / Directorate of Steam Boilers

Approval and Renewal of Manufacturer, Erector, Repairer and Pipe Fabricator

This service is provided under the Boilers Act, 1923. It is an Act to consolidate and amend the law relating to steam boilers.

DepartmentDirectorate of Steam Boilers
TypeNew
StageOperation / Renewal
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Copy of approval / last renewal — Required
2 Change in machinery, manpower, welders etc Wherever applicable If applicable
3 Copies of newly appointed/qualified welders Wherever applicable If applicable
4 Applicant Photo — Required
5 Applicant Signature — Required
6 List of Tools and tackles with technical specification, make, capacity etc — Required
7 List of manpower — Required
8 List of previous works carried out — Required
9 List of Welder details — Required
10 NOC obtained from local Authority / MIDC to undertake manufacturing activities — Required
11 Welder Certificates — Required
12 Approved plan of workshop showing the locations of all machines and equipment’s covering all the space area — Required
13 Map of area available for fabrication both covered / uncovered showing both plan and elevation details — Optional
14 SSI Unit, a copy of certificate — Optional

More from Directorate of Steam Boilers