Application for RoW for installation of Underground Telecommunication Network (OFCs, etc) on any public property

DepartmentDepartment of IT, Manipur DoT, Govt of India
TypeNew
StagePre-Establishment
Time limit45 days
FeeNo fee
Applied—

Documents to submit

#DocumentConditionRequired
1 (a)a copy of the authorisation under the Telecommunications Act, 2023 (44 of 2023), or license granted under the Indian Telegraph Act, 1885 (13 of 1885), granted by the Central Government, or exemption from such authorisation or license, as the case may be — Required
2 (b)details of the underground telecommunication network proposed to be laid — Required
3 (c)if the right of way pertains to existing telecommunication network, a copy of as-built drawingsof such telecommunication network — Required
4 (d)details of the mode of and the estimated duration for execution of the work — Required
5 (e)details of the estimated time of the day when the work is expected to be done, in case the facility provider expects the work to be done during specific time of the day — Required
6 (f)details of the estimated expenses the public entity may incur in consequence of the work proposed to be undertaken by the facility provider — Required
7 (g)details of the inconvenience that is likely to be caused to the public and the specific measures proposed to be taken to mitigate such inconvenience — Required