Certification of Electrical Installation by Chief Electrical Inspector
This approval is required by the chief electrical inspector whose installation capacity has exceeded 50KVA.
DepartmentDepartment of Energy
TypeNew
StagePre-Operation
Time limit1. Low Tension Installation:- 15-25 days, 2. High Tension Installation:- 20-30 days, 3. Extra High Tension Installation:- 25-35 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | The applicant will need to attach the following documents with the application: 1. Drawing approval order from the Engineer-in-Chief (Electricity) 2. Details of Equipment 3. Completion Certificate against the work from a licensed electrical contractor of appropriate category. 4. Permission letter of concerned DisCom division for power supply to the proposed work 5. Test certificate of the Transformer 6. Factory test reports of each equipment 7. Field test report for each equipment 8. Transformer oil test report from Standard Testing Laboratory 9. Copy of test reports from Standard Testing Laboratory for CT, PT and Energy meter used to record the units generated | In case of generator | If applicable |
More from Department of Energy
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Certificate for successful commissioning
- New Power Connection Application
- Permission to shift/build around existing utilities-Electrical Infrastructure (Transmission Lines)
- Permit for construction of transmission line
- Power Evacuation Arrangement
- Power line Crossings for 132 kV lines and above
- Temporary power connection