Insights into Company Bills & Payments

State approvals / Puducherry / Drugs Control Department

Drug Manufacturing License

DepartmentDrugs Control Department
TypeNew
StagePre-Operation
Time limit45 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Covering Letter — Required
2 Specific Power of Attorney in favour authorized signatory for submitting application on behalf of the company — Required
3 Site Plan and layout of the building with the name,address, scale, measurements of the area as per schedule- T requirement (For Ayurvedic, siddha ,unani) & as per Shedule – M Requirement(Allopathic Medicines) & as per Schedule-M-II requirement — Required
4 Self attested copies of documents pertaining to the possession of premises such as, Register ownership /rent /lease/allotment letter /Possession Letter, Tax Receipt, (Documents should be Registered with appropriate Authority ) — Required
5 Consent to establish from State pollution control Board — Required
6 List of Directors, Partners, Trustees, along with ROC Copy Registered Partnership deed, Trust deed — Required
7 List of Competent Technical Staff, with their qualification, Registration ,Experience, previous FDA Approvals,Etc — Required
8 Appointment/Acceptance Letter of Competent Technical staff of manufacturingSection — Required
9 Appointment/Acceptance Letter of Competent Technical staff of TestingSection — Required
10 Section wise List of plant and Machineries Yes — Required
11 NOC of department of industrial safety &Health — Required
12 Details of manufacturing Process, Process Flow Chart — Required
13 AHU installation and validation Certificate — Required
14 Water System installation and validation Certificate — Required
15 Site Master File — Required
16 Form 29 Licensed issued by SLA — Required
17 Form 10 Issued by CDSCO Where required If applicable
18 Constitution details of firms — Required
19 A copy of New Drug permission If applicable. If not, justification If applicable
20 Supporting data for BA/BE study whererequired — Required
21 Stability studies data — Required
22 Form 51 Undertaking — Required
23 List of SOPs — Required
24 Copy of Draft Labels — Required
25 Challan of Fees Paid To Be Upload — Required
26 Self declaration of technical person — Required
27 Any Other Document — Required
28 Application in Form 24 — Required
29 Self declaration of directors — Required

More from Drugs Control Department