State approvals / Punjab / Department of Labour (Director of Factories)

Building plan Approvals (Factories)

DepartmentDepartment of Labour (Director of Factories)
TypeNew
StagePre-Establishment
Time limit30 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Undertaking Form No. 1-C Process Flow Chart Form No. 1-D Form No. 1-E Form No. 1-F C.A. Certificate Appointment letter of competent person List of Machineries If required If applicable

Documents to upload (department's user manual)

#DocumentRequired
1Old scan copy of approved site plan and approval letter (site plan with approval letter, one PDF)
For an existing building with a stability certificate (amendment of the building plan)
Mandatory
2Appointment letter of competent person Mandatory
3Site land pattern Mandatory
4Form No. 1-C Mandatory
5Process flow chart Mandatory
6Form No. 1-D Mandatory
7List of machineries Optional
8Form No. 1-E Mandatory
9C.A. certificate Mandatory
10Form No. 1-F Optional
11Undertaking Mandatory
12Copy of registration / licence under the Factories Act 1948 Mandatory
13Other documents Optional
14Site plan Optional
15Main plan Optional
16Sections Optional
17Elevations and others Optional
18AutoCAD (.dwg) version of the drawings Optional

Source: department user manual

Before you apply

  • Before applying: the project's Common Application Form (CAF) must be verified by the Sector Officer at Invest Punjab or the GMDIC at the District Industries Centre. Apply from My Projects → Manage Project Applications → Apply for New Clearance.
  • Choose Addition (approval of building plan of an existing building with stability certificate) or Amendment as applicable; give the dispatch / reference number and issue date of the earlier approval.
  • The form records the proposed and actual building cost (₹ lakh) and 1% of each — the fee is computed on building cost.
  • Attachments are PDF (up to 20 MB); drawings may also be uploaded in .dwg.

How the application moves

  1. Investor — Fills the form and clicks Save and Submit.
  2. Department — Processed as in the departmental user manual for approval of proposed building plans under the Factories Act (pre-scrutiny, observations, approval).
  3. Investor — Downloads the issued clearance from the project page after entering an OTP sent to the registered mobile, and can rate the department's service.