Electrical Drawing Approval from Electrical Inspectorate

This approval is required for using HT meter above 70k from the Electrical Inspectorate

DepartmentEnergy Department
TypeNew
StagePre-Establishment
Time limit14 days
FeeVaries with the application
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Agreement letter between Contractor and Owner — Required
2 Contractor License Copy — Required
3 Supervisor permit copy of the electrical in charge of the company — Required
4 Electrical single line diagram from point of commencement of supply to the end use of electrical energy — Required
5 The structural layout showing plan and elevations with sectional and safe clearances — Required