State approvals / Tripura / Electrical Inspectorate
NOC from Electrical Inspectorate
DepartmentElectrical Inspectorate
TypeNew
StagePre-Operation
Time limit15 Days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Duly filled in Form of Inspection Report {As per Provision in CEA (Measures Relating to Safety and Electric Supply) Regulation, 2010. Single line diagram of electrical installation should be enclosed. Manufacturing test result of each and every equipment should be enclosed. Name and license copy of Supervisor license holder (preferable Degree/ Diploma Engineer) person who is regularly engaged for time to time observation of all the electrical equipment of this building | — | Required |
