State approvals / Uttarakhand / Uttarakhand Irrigation Department
Application for right of way along canal
DepartmentUttarakhand Irrigation Department
TypeApproval
StagePre-Establishment
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Requirements
- · Application Form · Detailed Project Report · Plan layout · L-section layout · Cross-section layout · Other relevant drawings
Documents accepted on the portal
| Document | Type | Issued by | Required |
|---|---|---|---|
| L-Section Layout UK-DCL-570 | Drawing / Maps | Council of Architecture | Optional |
| Cross - Section Layout UK-DCL-571 | Drawing / Maps | Council of Architecture | Optional |
| Layout Plan UK-DCL-54 | Drawing / Maps | Self | Optional |
| Project Report UK-DCL-55 | Project Report ( with Investment and Product Details and Line Diagram) | Self | Optional |
More from Uttarakhand Irrigation Department
- Application for acquisition of land and construction work
- Application for construction of new water course
- Application for cutting of supply for not being irrigated at site
- Application for transfer of water course
- NOC for surface water extraction
- NOC for water from rivers , canals tube wells , lift scheme at a fixed rate
- Permission for usage of water by installation of hydro-electric generation unit
- Permission to draw water from Irrigation canal/Reservoir/River/Gadera/Spring for Commercial use
- Permission to supply of water through intervening water-courses or change of source of water supply
- Registration under water tax for hydro projects
