State approvals / Uttarakhand / Power Transmission Corporation of Uttarakhand Ltd.
Application for short-term access without involving inter-state transmission system - day ahead operation
DepartmentPower Transmission Corporation of Uttarakhand Ltd.
TypeApproval
StagePre-Establishment, Pre-Operation
AppliedOffline
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Bids are accepted on specified format up to bid close time | — | Required |
| 2 | No amendment/ modification in bid is permi tted once submitted | — | Required |
| 3 | If a consumer does not participate in bidding process, his application shall be deemed as withdrawn and shall not be processed | — | Required |
| 4 | SLDC shall not entertain extension of time/ date for bi submission | — | Required |
| 5 | Bidders shall quote price rounded off to nearest whole number in denomination in which floor price has been determined | — | Required |
| 6 | The approved capacity for short term open access customer is not transferable to others | — | Required |
| 7 | The capacity available as a result of surrender or reduction or cancellation of approved c apacity by State Load Dispatch Centre may be reserved for other Short term Open Access Customer | — | Required |
| 8 | On expiry of the period of Short term Open Access Customer, the customer shall not be entitled | For any overriding preference for renewal of term | If applicable |
- Bidding Requirements
More from Power Transmission Corporation of Uttarakhand Ltd.
- Application for connectivity in inter-state transmission system under CERC (Open Access in Inter-State Transmission) Regulations, 2008
- Application for connectivity to distribution system by open access customer under UERC (Terms and Conditions for Intra-State Open Access) Regulations, 2015
- Application for long-term access involving distribution system under UERC (Terms and Conditions for Intra-State Open Access) Regulations, 2015
- Application for long-term access involving inter-state transmission system under CERC (Open Access in Inter-State Transmission) Regulations, 2008
- Application for long-term access without involving inter-state transmission system under UERC (Terms and Conditions for Intra-State Open Access) Regulations, 2015
- Application for medium-term access involving distribution system UERC (Terms and Conditions for Intra-State Open Access) Regulations, 2015
- Application for medium-term access involving inter-state transmission system under CERC (Open Access in Inter-State Transmission) Regulations, 2008
- Application for medium-term access without involving inter-state transmission system UERC (Terms and Conditions for Intra-State Open Access) Regulations, 2015
- Application for short-term access involving distribution system - bidding
- Application for short-term access involving distribution system - day ahead operation
- Application for short-term access involving distribution system - open access in advanced
- Application for short-term access involving inter-state transmission system under CERC (Open Access in Inter-State Transmission) Regulations, 2008