Insights into Company Bills & Payments

State approvals / Uttarakhand / Uttarakhand Renewable Energy Development Agency

Revalidation of accreditation of renewable energy generation project or distribution licensee under REC mechanism

DepartmentUttarakhand Renewable Energy Development Agency
TypeCertificates
AppliedOnline
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Documents to submit

#DocumentConditionRequired
1 Connectivity/ off - take agreement — Required
2 Transmission Service Agreement or Long/Medium/Short term access agreement — Required
3 Power Purchase Agreement — Required
4 Copies of statutory clearances and approvals — Required
5 Certification from the State Transmission Utility or the concerned Distribution Licensee with respect to Power Evacuation Arrangement — Required
6 Certification from SLDC that the applicant possesses the necessary infrastructure required to carry out energy metering and time - block - wise acco unting — Required
7 Single Line Diagram showing metering arrangement and location of meters along with details such as Meter Type, Manufacturer, Model, Serial Number, Class and Accuracy etc., duly verified by concerned officer of STU/Distribution Licensee not below th e rank of Executive Engineer — Required
8 Date of Commissioning of RE Generation Project in respect of existing eligible RE Generation Project or proposed Date of Commissioning of new RE Generation Project for accreditation — Required
9 Model and Make for critical equipment for t he RE Generation Project. Confirmation of compliance of critical equipment with relevant applicable IEC or Central Electricity Authority (CEA) Standards — Required
10 Copy of Memorandum of Association & Articles of Association of a company/certificate of Incorporation & Certificate of Business Commencement In case of Public Ltd. Company If applicable
11 Undertaking with respect to sale of electricity that it sells the electricity to — Required
12 Distribution licensee of the area at a c ost not exceeding the pool cost of power — Required
13 Any other licensee or to open access customer at a mutually agreed price — Required
14 Undertaking of not having entered into PPA on preferential tariff for the capacity for which participation in REC mechanism is sought — Required
15 Underta king with respect to the availability of land in possession of applicant required for setting up the generating station — Required
16 Undertaking in respect of compliance with the usage of fossil fuel criteria as specified by MNRE. Document Checklist for UPCL/PTCUL — Required
  • Mechanism b y UREDA
  • Section A: Owners details
  • Section B: Operator details (in case, the owner and operator are different legal entities)
  • Section C : Generating station details
  • Section D : Connectivity details with concerned licensee
  • Section E : Metering details
  • Section F : Statutory Cle arance Details: Copy of
  • Section G : General Details
  • Section H : Details of Fees and Charges
  • Section I : Declaration
  • Sec tion A: Distribution Licensee (UPCL/PTCUL) details
  • Section B : Generating station details
  • Section C : Details of Fees and Charges
  • Section D : Declarations
  • Section E : Details of RPO for last 4 years