State approvals / Assam / Inspectorate of Electricity
Approval for commencement of power supply in the electrical installations of multi-storied building
This approval is required for commencement of power supply to the multi-stored buildings (height more than 15 meters)
DepartmentInspectorate of Electricity
TypeNew
StagePre-Operation
Time limit15 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Electrical lay out drawings that show the appropriate rating / type / size(s) of all electrical Generators, equipments, accessories, etc. in the single line diagram and dimensions / clearances etc. in the physical layout plan & in the details of earthing layout plan including panels, Lightening arrestor | — | Required |
| 2 | A details load schedule of the connected load and test report of the internal electrical installation including earth system with due seal and signature of contractor /authorized person(s) and countersigned by the consumer / owner / occupier or its agent | — | Required |
| 3 | A copy of permission / NOC for construction of the building along with approved drawing from Municipal / Development / Appropriate local Authority | — | Required |
| 4 | Certified copy of approved drawing and NOC to construct the building and completion certificate to be enclosed | — | Required |
| 5 | Connected load with break up of lighting, powers and others type of load in annexed sheet | — | Required |
| 6 | Distribution System details:(A single line diagram clearly indicating all devices, controls, connection, with all ratings and specification to be furnished. Load in each sub-circuit to be shown. In case of individual flats/ units having similar connections and electrical loads, details of one unit of each type only need to be furnished) | — | Required |
| 7 | Physical layout plan indicating the position of the transformer, panels, generator, route of all OH line/cables with dimensions/clearances | — | Required |
| 8 | Position of Main Control Room/Breakers/MCCBs/MCB, DB & electrical cable ducts and layout of main cable(s) | — | Required |
| 9 | A single line diagram of the main panel(s) indicating all connections and control/protective and metering equipment/devices with ratings and specifications | — | Required |
| 10 | A front view of the panel(s) indicating all equipment/devices | — | Required |
| 11 | A Test Report of the panel duly signed by the Electrical Supervisor of the manufacturer who has manufactured the electrical panel(s) | — | Required |
| 12 | Details of earthing (A layout of earthing of the main panel and other equipment to be furnished in the diagram required under 7.4 above.) | — | Required |
| 13 | Has lightning protection been provided:?Detailed diagram of lightening protection to be provided separately | — | Required |
| 14 | Furnish details of fire protection/fire alarm system provided. NOC of state fire department to be furnished | — | Required |
| 15 | Testing. A detailed test report with circuit wise insulation resistance and details of earth resistance test to be furnished. (Separately for each section, each panel and each unit/conductor) | — | Required |
More from Inspectorate of Electricity
- Application for permission to install a lift/ to make additions or alterations to the installed lift
- Application for renewal of license of escalators/lift
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Certificate for successful commissioning
- Cinema operator license.
- Electrical contractor's license.
- Electricity Connection (Load Sanction)
- License for operating a lift installed before the commencement of the act.
- License for operating a Lift/Escalator
- License for operating an escalator installed before the commencement of the act.
- Obtaining authorization for erection of lifts or escalator.
- Obtaining authorization for maintenance of lifts or escalators.