State approvals / Assam / Inspectorate of Electricity
License for operating a lift installed before the commencement of the act.
This license is required for operating a lift that was installed before the commencement of the act
DepartmentInspectorate of Electricity
TypeNew
StagePre-Operation
Time limit15 Days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Up to date Annual Maintainance Contract | — | Required |
| 2 | Inspection manual in the prescribed format | — | Required |
| 3 | NOC for construction of the building | — | Required |
| 4 | Declaration from the person authorized under section 13 for erection of lifts/escalators (Undertaking to Carry Out andComplete Erection / Alteration) (iii) | — | Required |
| 5 | Declaration from the person authorized under section 13 (Certificate of Completion ofErection / Alteration) (v) | — | Required |
| 6 | license of operating a lift before commencement of the Act.(VIII) | — | Required |
| 7 | Details of Lift(s) under maintenance (XI) | — | Required |
More from Inspectorate of Electricity
- Application for permission to install a lift/ to make additions or alterations to the installed lift
- Application for renewal of license of escalators/lift
- Approval for commencement of power supply in the electrical installations of multi-storied building
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Certificate for successful commissioning
- Cinema operator license.
- Electrical contractor's license.
- Electricity Connection (Load Sanction)
- License for operating a Lift/Escalator
- License for operating an escalator installed before the commencement of the act.
- Obtaining authorization for erection of lifts or escalator.
- Obtaining authorization for maintenance of lifts or escalators.
