State approvals / Assam / Inspectorate of Boilers
Application for grant of recognition as manufacturer of Boilers and Boiler Components under IBR 1950
DepartmentInspectorate of Boilers
TypeNew
StagePre-Operation
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | NOC for the activities of the firm from the local authority | — | Required |
| 2 | A copy power sanction letter from appropriate authority | — | Required |
| 3 | A copy of plan of machinery layout alongwith list of equipment & machinery, tools & tackles and NDT facilities | — | Required |
| 4 | Detail qualification & experience of personnel employed (Certificates of welders are to be enclosed) | — | Required |
| 5 | Few photographs of shopfloor showing equipment, machinery and NDT facilities | — | Required |
More from Inspectorate of Boilers
- Application for Registration of Steam Feed Blow Down Line under IBR 1950
- Application for Renewal of Approval as Boiler Erector Repairer and Steam Feed Water Pipe Line Fabricator Erector under IBR 1950
- Application for Renewal of Certificate of Boiler/Economizer Form II
- Grant of Approval/Renewal as Boiler Erector / Repairer and Steam / Feed Water Pipe Line Fabricator / Erector under IBR
- Registration and Certification of Package Boiler/Economizer Form 1
- Renewal of Recognition as Manufacturer of Boiler and Boiler Components under IBR 1950
