State approvals / Gujarat / Forest & Environment Department
GPCB - Consent to Establish
This approval is requied to ste-up an industry as per Air Act and Water Act. This is applicable to all the Districts in the State.
DepartmentForest & Environment Department
TypeNew
StagePre-Establishment
Time limit120 working days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Application processing fees for the period of five years with break-up | — | Required |
| 2 | Site plan showing the distance of (NA if the industry is to be located in GIDC estate) | — | Required |
| 3 | Nearest residential area with certificate of Talati /Mantri from the proposed site | — | Required |
| 4 | Nearest of state/ national highway from the site of the unit/industries | — | Required |
| 5 | Nearest Lake/ Pond/ River/ Sea/ Canal/ Forest area and any water body | — | Required |
| 6 | Nearest spaces of tourist and historical important School, collage, Temple, Mosque etc | — | Required |
| 7 | Lay Out plan showing the location of the: Vents/ Stacks/ Chimney and emission points | — | Required |
| 8 | Drainage and final disposal for liquid effluent | — | Required |
| 9 | Solid waste collection/ storage/ disposal facility | — | Required |
| 10 | Total available open land in the industrial premises | — | Required |
| 11 | List of partner/ Directors (names along with residential address) and telephone number | — | Required |
| 12 | Details of effluent Treatment Plant along with flow diagram | — | Required |
| 13 | Letter of membership of common effluent Treatment plant | If applicable | If applicable |
| 14 | Analysis report of Treated and untreated effluent (Air, water and Hazardous solid waste for Schedule II category from Laboratory specified under HW Rules) | — | Required |
| 15 | Break-up of water uses and water balance | — | Required |
| 16 | Details of manufacturing process, with process flow diagram and all chemical equations | — | Required |
| 17 | Environmental statement (form-V) | — | Required |
| 18 | Certificate of SSI (Compulsory for HW fees) | — | Required |
| 19 | Details of air pollution control measures: stack/ chimney wise for flue gas and process emission | — | Required |
| 20 | Boiler, Steam generating certificate indicating steam generation and consumption of coal tons per day duly certified by office of boiler inspector (in case of IBR Boiler) | — | Required |
| 21 | Compliance regarding public hearing /environmental clearance certificate | If applicable Ease of Doing Business Page 4 of 6 | If applicable |
| 22 | List of raw material with quantity per month (MT/M) (Verify Applicability of CPCB Registration) | — | Required |
| 23 | List of product/by-product with quantity per month (MT/M) (Verify Applicability of CPCB Registration for disposal) | — | Required |
| 24 | Copies of consent order /authorization order along with CC&A for which they have last consent | — | Required |
| 25 | C.A. Certificate for project (if SSI unit) | — | Required |
| 26 | C.I. NO. For Dyes | — | Required |
| 27 | Annual Report in Form-IV (in case of renewal application), with documents of disposal complying Generation, Stock and Disposal justifying stock (Every Year by 31st January) | — | Required |
| 28 | Annual Report in Form 12 in case of recycler/ re-refiner of HW as covered in Schedule 4, 5 and 6 of HW Rules | — | Required |
| 29 | Annual Report in Form 13 in case of Generator or Auctioneer of HW as covered in Schedule 4, 5 and 6 of HW Rules | — | Required |
| 30 | Form-V under Hazardous waste Rules-1989 | In case of accident | If applicable |
| 31 | Form-VI & Form-VII | In case of important of Hazardous waste under Hazardous waste Rules-1989 | If applicable |
| 32 | Photographs of Hazardous Waste Storage facilities | — | Required |
| 33 | Undertaking should be checked as per amended Rules, 2003 – | In case of nonapplicability of HW Rules | If applicable |
| 34 | Details of step taken by the applicant for reduction and prevention in the waste generated or for recycling or reuse (Copy of under taking for the same) | — | Required |
| 35 | Membership certificate of common TSDF /Common incinerator | If applicable | If applicable |
| 36 | Details of HW as per 2003 amended rules or for all categories with Quantity, for Reception (Re-processor/Re-cycler), Generation, Collection, Storage, Treatment (Details of Method) and Disposal (Details of Method) | — | Required |
| 37 | Compliance of earlier authorization | In case of renewal | If applicable |
| 38 | Copy of CPCB registration or proof of application made to CPCB in case of recycler/ rerefiner of HW as covered in Schedule 4, 5 and 6 of HW Rules | — | Required |
- Properly filled up Form: I as per Hazardous waste (M&H) amended Rules, 2003
More from Forest & Environment Department
- Application format for Authorisation C&D Waste Rules-2016
- Application format for Authorisation, BMW-2016
- Application format for Authorisation, SWR-2016
- Forest Clearance
- Forest Right Act (FRA)
- GPCB - Application for E-waste (Management and Handling)
- GPCB - Consolidated Consent and Authorisation
- GPCB - Plastic Waste Registration
- NOC for tree felling - Forest Department
- Permission for Tree Cutting
- Tree Transit permission -Forest Department
- Wildlife Clearance
