State approvals / Gujarat / Forest & Environment Department
GPCB - Application for E-waste (Management and Handling)
This permission is required for industries generating e-waste
DepartmentForest & Environment Department
TypeNew
StageOperation / Renewal
Time limit90 Days
FeeFee as notified by the department
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Compliance of CPCB guidelines for E-waste recycling under E-waste Rules, 2016 | — | Required |
| 2 | Characteristics of air emissions, waste water generation and other solid wastes including hazardous waste expected to be generated during utilization of hazardous wastes | — | Required |
| 3 | Copy of valid CTE/CCA | — | Required |
| 4 | Details of Environmental Management System with flow diagram | — | Required |
| 5 | Details of E-waste storage facility and process area facility | — | Required |
| 6 | Details of occupational health and safety measures | — | Required |
| 7 | Equipment layout along with their capacity for the utilization of E-wastes | — | Required |
| 8 | Installed capacity as per registration issued by DIC or any other authorized govt. agency. (Provide copy) | — | Required |
| 9 | Material Balance with and without utilizing E-wastes | — | Required |
| 10 | Name/Type & quantity (in MTA) of the proposed E-wastes to be utilized including category (as per the Schedule I) intended for utilization | — | Required |
| 11 | Process details for utilization of E-waste and its Flow Diagram | — | Required |
More from Forest & Environment Department
- Application format for Authorisation C&D Waste Rules-2016
- Application format for Authorisation, BMW-2016
- Application format for Authorisation, SWR-2016
- Forest Clearance
- Forest Right Act (FRA)
- GPCB - Consent to Establish
- GPCB - Consolidated Consent and Authorisation
- GPCB - Plastic Waste Registration
- NOC for tree felling - Forest Department
- Permission for Tree Cutting
- Tree Transit permission -Forest Department
- Wildlife Clearance
