Insights into Company Bills & Payments

State approvals / Gujarat / Energy & Petrochemicals Department

Certification of HV/EHV Electrical Installation by Chief Electrical Inspector

This approval is required for setting up electric installations exceeding 440V in an establishment.

DepartmentEnergy & Petrochemicals Department
TypeNew
StagePre-Establishment
Time limit30 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Overall Single Line Diagram showing existing and proposed installations For the Approval of the HV/EHV electrical installations If applicable
2 Equipment Layout drawing with plot plan For the Approval of the HV/EHV electrical installations If applicable
3 Earthing layout drawing with Standard Earth Pit For the Approval of the HV/EHV electrical installations If applicable
4 Earthing Resistance Calculations with reference to Step and Touch Potential (In case of EHV) For the Approval of the HV/EHV electrical installations If applicable
5 Fault level Calculations. (In case of EHV) For the Approval of the HV/EHV electrical installations If applicable
6 Overall Single Line Diagram Approval of the EHV Overhead Line or Under Ground Cable If applicable
7 Equipment Layout drawing with plot plan Approval of the EHV Overhead Line or Under Ground Cable If applicable
8 Route map with details of line crossing with existing line/Road/Railway Approval of the EHV Overhead Line or Under Ground Cable If applicable
9 Earthing layout drawing with Standard Earth Pit Drawing Approval of the EHV Overhead Line or Under Ground Cable If applicable
10 Tower/Pole structure drawing Approval of the EHV Overhead Line or Under Ground Cable If applicable
11 Permission of the Local Authority/ Owner for laying line or cable Approval of the EHV Overhead Line or Under Ground Cable If applicable
12 In case of U/G cable, Detail of the Cable Duct and Cross section of the Cable Approval of the EHV Overhead Line or Under Ground Cable If applicable
13 Overall Single Line Diagram showing existing and proposed installations Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
14 Equipment Layout drawing with plot plan Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
15 Earthing layout drawing with Standard Earth Pit Drawing Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
16 Details of CGP/DG in prescribed format with declaration Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
17 Purchase invoice, Load List, Copy of the Electricity Bill. Or In case of estimate from DISCOM If applicable
18 In case of U/G cable, Detail of the Cable Duct and Cross section of the Cable Approval of the Non-Conventional Energy Source based electrical installation (Solar, WTG etc) Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
19 Overall Single line diagram showing existing and proposed installations Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
20 Equipment layout drawing Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
21 Earthing layout drawing with standard earth pit Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
22 Calculation of the PV cell required for desired capacity & inverter details (in case of solar) Approval of the Captive Generating Plant (CGP) or DG Installations If applicable
23 Copy of the sanction letter of GEDA (in case of Solar) Approval of the Captive Generating Plant (CGP) or DG Installations If applicable

More from Energy & Petrochemicals Department