This approval is required for establishing a generating plant.

DepartmentEnergy & Petrochemicals Department
TypeNew
StagePre-Establishment
Time limit15 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Overall Single Line Diagram – showing existing and proposed installations — Required
2 Equipment Layout Drawing with plot plan — Required
3 Earthing layout drawing with Standard Earth Pit Drawing — Required
4 Details of DG in prescribed format with declaration — Required
5 Purchase Invoice, Load List, Copy of the Electricity Bill, OR In case of estimate from DISCOM If applicable
6 In case of U/G cable, details of the Cable Duct and Cross-section of the Cable — Required