Insights into Company Bills & Payments

State approvals / Himachal Pradesh / Department of Electrical Inspectorate

Approval to energise electrical Installations (Other than transmission Lines)

This approval is required for an applicant who wants to apply for grant of approval to energise electrical installations other than transmission lines.

DepartmentDepartment of Electrical Inspectorate
TypeNew
StagePre-Operation
Time limit21 days, Approval Granted within 7 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 List of equipment mention the data: (Name, Make, Sr. No., MW/KW, KVA, Quantity). Single line diagram with metering & protection. Drawing showing the location, layout, elevation and section. Drawing of earthing with Electrodes/Mats. Manufacturers test certificate for each equipment. Insulation test results and earth resistance of individual, combined electrodes and earth mat. Details of electrical Contractor and Supervisor. Copy of NOC from supplier In case of D.G. set to be commissioned as standby source of supply If applicable