State approvals / Himachal Pradesh / Department of Electrical Inspectorate
Approval to Energize Transmission Lines
This approval is required for an applicant who wants to apply for grant of approval to energise transmission lines.
DepartmentDepartment of Electrical Inspectorate
TypeNew
StagePre-Operation
Time limit21 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Drawing showing the location, layout and crossings. Copy of test certificate of Manufacturer in respect of conductor, ground wire, disk insulators. Details of electrical Contractor and Supervisor (enclose copy). Footing resistance of each tower (above 33 KV). Men & material removal certificate | — | Required |
More from Department of Electrical Inspectorate
- Application to obtain permission for Diesel Generator
- Approval and clearance license for installment except DG
- Approval to energise electrical Installations (Other than transmission Lines)
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Center Installation
- Certificate for successful commissioning
- Electrical Drawing Approval from Electrical Inspectorate
- License for new cinema operators
- License for new cinema theatre
- NOC for commissioning HT units
- NOC NBW Transformer Installation/ Distribution Transformer
- Permit for construction of transmission line