Charging permission for usage above 132 KV (or above)
1. It would kindly be appreciated that 132 KV system is the weakest link because many of the lines are very old and also the system is prone to frequent trippings because of interconnection with Discoms wherein fault trippings and other trippings on 33 KV side are excessive. 2. It may also be appreciated that maintenance / breakdown attendance of 132 KV System, which is spread in far flung area, is rather difficult and time consuming.
DepartmentEnergy Department
TypeNew
StagePre-Operation
Time limit7 days (for SLD approval) 7 days (for Installation Approval) As per MP Lok Seva Guarantee Adhinium, 2010
FeeNo fee
AppliedApply on the state single window
More from Energy Department
- Application for Drawing Approval Under Electrical Installation HV/EHV/ Diesel Generator/Non-Conventional
- Application for Inspection and Approval of HV/EHV/Diesel Generator/Non-conventional Installation by Electrical Inspector
- Approval for new service connection HT Central Discom
- Approval for New Service Connection HT East Discom
- Approval for New Service Connection HT West Discom
- Approval for new service connection LT Central Discom
- Approval for New Service Connection LT East Discom
- Approval for New Service Connection LT West Discom
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Certificate for successful commissioning
- Electricity Connection (Load Sanction)
- Net Metering and Grid Connected Rooftop