State approvals / Uttar Pradesh / Pollution Control Board
Authorization and Registration under E-Waste (Management) Rules 2016
Every producer, consumer or bulk consumer, collection centre, dismantler and recycler of e-waste involved in the manufacture, sale, purchase and processing of electrical and electronic equipment or components.
DepartmentPollution Control Board
TypeNew
StagePre-Operation
Time limit52 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Refer Procedure Detail | — | Required |
More from Pollution Control Board
- Authorization under Bio Medical Waste Management Rules 2016
- Authorization under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules 2016
- Consent to Establish
- Consent to Establish Under Air and Water Act(NOC)
- Consent to Operate
- Consent to Operate under the Air (Prevention and Control of Pollution) Act 1981
- Disposal of Hazardous Waste
- Registration under Plastic Waste Management Rules 2016
- Registration under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules 2016
- Standby DG sets
