State approvals / Uttar Pradesh / Pollution Control Board
Registration under Plastic Waste Management Rules 2016
It is required by all the business entities in order to manage the plastic waste generated by them.
DepartmentPollution Control Board
TypeNew
StagePre-Operation
Time limit25 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Refer Procedure Detail | — | Required |
More from Pollution Control Board
- Authorization and Registration under E-Waste (Management) Rules 2016
- Authorization under Bio Medical Waste Management Rules 2016
- Authorization under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules 2016
- Consent to Establish
- Consent to Establish Under Air and Water Act(NOC)
- Consent to Operate
- Consent to Operate under the Air (Prevention and Control of Pollution) Act 1981
- Disposal of Hazardous Waste
- Registration under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules 2016
- Standby DG sets
