Insights into Company Bills & Payments

State approvals / Uttarakhand / State Industrial Development Authority

Layout Approval

DepartmentState Industrial Development Authority
TypeApproval
StagePre-Establishment
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Documents to submit

#DocumentConditionRequired
1 Appendix 1 - Application to erect, re-erect, demolish or to make material alteration in a building — Required
2 Appendix 2A - Certificate of Undertaking by person holding Project Management responsibility — Required
3 Appendix 2B - Certificate in prescribed format by the Technical person — Required
4 Appendix 5 - Self-declaration in the prescribed format — Required
5 Appendix 14 - Application for development permission for Self-use Development — Required
6 Online payment of building permit/development fees through payment gateway — Required
7 Boundaries of the plot/s, its sub divisions, position of the plot in relation to the neighbouring streets, street names/widths and direction of north point relative to the plan of building — Required
8 Existing building, roads/street and other existing development on site — Required
9 The positions of the building units immediately adjoining the proposed development — Required
10 The area within the regular line of street not to be built upon but to be added to the street, hatched in green together with its measurements — Required
11 Existing physical feature such as trees, wells, drains, pipeline, high-tension line, railway line and others — Required
12 Location of plot proposed to be constructed with complete dimensions and means of access from the road/street and proposed new roads and streets, their levels and width, buffer zones — Required
13 Community facilities/utility/service buildings with proposed use — Required
14 Open space required as per BBL-2016, green buffle around proposed area for development — Required
15 Parking provisions as per BBL-2016, loading & unloading areas — Required
16 Land use pattern, land documents and one plan with superimposed sazara details — Required
17 Details of existing services-water supply, sewerage and storm water — Required
18 Details of proposed water supply, sewerage and storm water services — Required
19 Location of the plot in relation to the nearby public road — Required
20 Alignment and width of all the existing roads including the road from which the plot has access from the major road. Existing access road and proposed new road should be shown clearly and distinctly — Required
21 Dimensions and area of common plot provided in the layout/sub division of plot As required under these regulations If applicable
22 Tree-plantation required as per BBL-2016 — Required
23 Lay out and details of percolating wells required for rain water harvesting — Required
24 Lay out of borewells / tubewells If any If applicable
25 Details/ layout of proposed Rainwater Harvesting System — Required
26 Solid waste disposal system — Required
27 Waste/effluent treatment & disposal system — Required
  • Details required in Layout/Site Plan for development permission of Industrial Estate. This layout plan/site plan shall be drawn to a scale 1:1. The plan shall show

More from State Industrial Development Authority