State approvals / Uttarakhand / State Industrial Development Authority
Occupancy
DepartmentState Industrial Development Authority
TypeCertificates
StagePre-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Document checklistApplication formFee structureProcedure (SOP)TimelinesInspection checklist Apply on Invest Uttarakhand (SWCS)
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Soft copies of Architectural drawings in Pre DCR format (Site Plan, section, Elevation and Building Plan in one file) | — | Required |
| 2 | Online payment of completion fees through payment gateway | — | Required |
| 3 | Valid time extension certificate | If applicable | If applicable |
| 4 | Photographs of the building from front, Rear and side setbacks | — | Required |
| 5 | Scanned copy of registration Membership certificate of technical person | — | Required |
| 6 | Appendix 7 – Completion Certificate from Owner | — | Required |
| 7 | Appendix 8 – Completion Certificate from Structural Engineer | — | Required |
| 8 | Appendix 10 – Completion Certificate from Architect | — | Required |
| 9 | Appendix 9 - Completion Certificate to be issued by third party Empanelled Architect, accredited in the online system | — | Required |
| 10 | Scanned Copy of receipt of fees deposited for Power Connection | — | Required |
| 11 | Scanned Copy of receipt of payment of water/sewer connection charges, Meter charges (if not submitted at the time of plan approval) | — | Required |
| 12 | Approved Building Plan Approval & Approval Certificate for the original plan | — | Required |
| 13 | Copy of EM Part II / UAM for fees calculation | — | Required |
| 14 | Soft copies of Structural drawings in one file in .pdf format | — | Required |
| 15 | NOCs from Departments | As applicable | If applicable |
| NOCs from Departments | |||
| Fire Department | As applicable | If applicable | |
| UEPPCB | As applicable | If applicable | |
| UPCL | As applicable | If applicable | |
| Irrigation Department | As applicable | If applicable | |
| Forest Department | As applicable | If applicable | |
| UREDA | As applicable | If applicable | |
| District Magistrate (Explosives) | As applicable | If applicable | |
| NHAI | As applicable | If applicable | |
| AAI | As applicable | If applicable | |
| ASI | As applicable | If applicable | |
| Defence | As applicable | If applicable | |
| Jal Sansthan | As applicable | If applicable | |
| CGWA | As applicable | If applicable | |
| PWD | As applicable | If applicable | |
- The following set of documents is to be attached during online application for CTO process along with online pa
More from State Industrial Development Authority
- Addition alteration
- Addition Alteration
- Building Plan Approval (CTE)
- Commencement of Construction
- Completion
- Compounding
- Extension
- Intermediate inspection
- Layout Approval
- One Time Settlement
- Periodic renewal of occupancy certificate - medium / high risk category of multiple dwelling unit
- Plinth Level Inspection