State approvals / Assam / Inspectorate of Electricity
Obtaining of authorization for periodical inspection and testing of lifts or escalators.
This approval is required for periodic inspection and testing of lifts or escalators
DepartmentInspectorate of Electricity
TypeNew
StagePre-Operation
Time limit15 Days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Up to date Annual Maintenance Contract (AMC) | — | Required |
More from Inspectorate of Electricity
- Application for permission to install a lift/ to make additions or alterations to the installed lift
- Application for renewal of license of escalators/lift
- Approval for commencement of power supply in the electrical installations of multi-storied building
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Certificate for successful commissioning
- Cinema operator license.
- Electrical contractor's license.
- Electricity Connection (Load Sanction)
- License for operating a lift installed before the commencement of the act.
- License for operating a Lift/Escalator
- License for operating an escalator installed before the commencement of the act.
- Obtaining authorization for erection of lifts or escalator.
