State approvals / Assam / Inspectorate of Electricity
Permission for installation/alteration/addition of Escalators
DepartmentInspectorate of Electricity
TypeNew
StageOperation / Renewal
Time limit15 days
FeeNo fee
AppliedApply on NSWS
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | Layout of the escalator installation | — | Required |
More from Inspectorate of Electricity
- Application for permission to install a lift/ to make additions or alterations to the installed lift
- Application for renewal of license of escalators/lift
- Approval for commencement of power supply in the electrical installations of multi-storied building
- CEIG/CEA Approvals of Switchyard Equipment & Transmission Line
- Certificate for successful commissioning
- Cinema operator license.
- Electrical contractor's license.
- Electricity Connection (Load Sanction)
- License for operating a lift installed before the commencement of the act.
- License for operating a Lift/Escalator
- License for operating an escalator installed before the commencement of the act.
- Obtaining authorization for erection of lifts or escalator.