State approvals / Assam / Inspectorate of Electricity

Seeking approval to commence power supply in overhead line exceeding 650 volts.

This approval is required to commence power supply in overhead lines exceeding 650 volts

DepartmentInspectorate of Electricity
TypeNew
StagePre-Operation
Time limitWithin 15 days
FeeNo fee
AppliedApply on NSWS

Documents to submit

#DocumentConditionRequired
1 Details of earthing — Required
2 Sketch showing details of different type of supports used in the overhead line — Required
3 A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances — Required
4 A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT, circuit breaker, isolator, fuses, gangs, earthing & also roads, rivers and prominent structures along with clearances both vertical & horizontal — Required
5 Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV; Route map of the overhead line, showing alignment of nearby overhead line If any, with clearances both vertical and horizontal If applicable
6 Copy of No Objection Certificate or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner of any such land/ premises or part thereof that is crossed by the overhead line — Required
7 Copy of Provisional Estimate — Required
8 Copy of PTCC clearance If the line is in proximity or crosses telecommunication line If applicable
9 Authorization Letter — Required
10 TEST REPORTS — Required
11 Cable Test Report — Required
12 Undertaking for any government Schemes — Required