State approvals / Mizoram / Mizoram Pollution Control Board (MPCB)
"Public Hearing for Industrial Units as specified by the schedule of the Environmental Impact Assessment Notification 2006) "
DepartmentMizoram Pollution Control Board (MPCB)
TypeNew
StagePre-Establishment
FeeVaries with the application
Applied—
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | At least 10 hard copies and an equivalent number of soft (electronic) copies of the draft EIA Report | — | Required |
| 2 | Summary of Environment Impact Assessment report in English and in the official language of the state/local language | — | Required |
| 3 | (Documents has to be prepared strictly in accordance with the schedule III of the EIA Notification, 2006 and the Terms of Reference communicated to him after Scoping by MoEF& CC / SEIAA | — | Required |
| 4 | The documents are to be furnished to | — | Required |
| 5 | District Magistrate/ District collector/Deputy Commissioner | — | Required |
| 6 | Zila Parishad or Municipal Corporation or Panchayats | — | Required |
| 7 | District Industries Office | — | Required |
| 8 | Urban Local Bodies (ULBs) / PRIs Concerned/Development authorities | — | Required |
| 9 | Concerned Regional Office of the Ministry of Environment and Forests | — | Required |
| 10 | EIA/EMP of the project | — | Required |
More from Mizoram Pollution Control Board (MPCB)
- "Authorization under the Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016."
- "Authorization for processing/ recycling/ treatment and disposal of solid waste under Solid Waste Management (SWM) Rules, 2016"
- "Registration of Manufacturer, Producers, Refurbishers and recycler of E-Waste under E- Waste Management (EWM) Rules, 2016"
- "Registration of refurbishing and recycling units under Battery Waste Management Rules, 2022 "
- Authorization for collection/reception/treatment/transport/ storage/disposal of bio-medical waste. under Bio-medical Waste Management Rules, 2016
- Authorization to recycling and processing under the Construction and Demolition Waste Management Rules, 2016
- Combined Consent Under Water (Prevention and Control of Pollution) Act, 1974 & the Air (Prevention and Control of Pollution) Act, 1981
- CTE
- CTO
- Registration of Producer / Importer / Brand-owner (PIBO) producers, recyclers and manufacturing units under Plastic Waste Management (PWM) Rules, 2016 and as amended
