Insights into Company Bills & Payments

State approvals / Uttarakhand / Department of Labour

Approval for boiler manufacturer certificate

DepartmentDepartment of Labour
TypeApproval
StagePre-Establishment, Pre-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Documents to submit

#DocumentDepartment checksRequired
1 Manufacturing Drawings
UK-DCL-288
Whether previously approved drawings uploaded? Mandatory
2 Particulars of Materials, Design and Construction of Boilers
UK-DCL-289
Whether related approved paper uploaded? Mandatory
3 Directorate of Treasuries, Pension & Entitlements Treasury Challan
UK-DCL-30
Applicable only if there is any pending fees Whether payment made in right head, challan is of current financial year and the amount is as per prescribed fee Special Class Boiler manufacturer: S. N. Document Code Document Type Is Document Type Mandatory Issued By Document Name Is Docu ment Mand atory Comment Check points Mandatory
4 Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
5 Invoice - Raw Material ( Latest )
UK-DCL-161
Invoices of materials ment ioned in column titled “Document Name” Welding machine, Panel bending machine, Welding and Grinding equipment, Radila drilling machine, Chamfering machi ne, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 500kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) Mandatory
6 Report (DPR, Technical, Financial )
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection ( MPI), Liquid Penetrant Inspecti on (LPI), Positive material Identification(PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 5 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certif Mandatory
7 Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
8 Invoice - Raw Material ( Latest )
UK-DCL-161
Invoices of materia ls mentioned in column titled “Document Name” above), Band saw cutting machine, Air compressor, Measuring tools) Mandatory
9 Report (DPR, Technical, Financial)
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI), Positive material Identification(PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 4 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certific Mandatory
10 Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
11 Invoice - Raw Material ( Latest )
UK-DCL-161
Invoices of materials menti oned in column titled “Document Name” Radial drilling machine, Chamfering machin e, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 200kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) Mandatory
12 Report (DPR, Technical, Financial)
UK-DCL-384
Reco gnized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or five years for Diploma Engineer(s), with experience Certificate of 3 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Ce Mandatory
13 Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
14 Invoice - Raw Material ( Latest )
UK-DCL-161
Invoices of materials mentioned in column titled “Document Name” Mandatory
15 Report (DPR, Technical, Financial)
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or four years for Diploma Engineer(s), with experience Certificate of 2 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Cer Mandatory
16 Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
17 Invoice - Raw Material ( Latest )
UK-DCL-161
Invoices of materials mentioned in column titled “Document Name” 3 Engineering Degree in relevant discipline or three years for Diploma Engineer(s), with experience Certificate of 1 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision Form Mandatory

Documents accepted on the portal

DocumentTypeIssued byRequired
Invoice - Raw Material ( Latest )
UK-DCL-161
Miscellaneous DocumentSelfMandatory
Manufacturing Drawings
UK-DCL-288
Drawing / MapsSelfMandatory
Particulars of Materials, Design and Construction of Boilers
UK-DCL-289
Project Report ( with Investment and Product Details and Line Diagram)SelfMandatory
Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Miscellaneous DocumentSelfMandatory
Attachment for experience of the personnel employed
UK-DCL-334
Qualification DocumentsSelfMandatory

More from Department of Labour