State approvals / Uttarakhand / Department of Labour
Approval for boiler manufacturer certificate
DepartmentDepartment of Labour
TypeApproval
StagePre-Establishment, Pre-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Documents to submit
| # | Document | Department checks | Required |
|---|---|---|---|
| 1 | Manufacturing Drawings UK-DCL-288 |
Whether previously approved drawings uploaded? | Mandatory |
| 2 | Particulars of Materials, Design and Construction of Boilers UK-DCL-289 |
Whether related approved paper uploaded? | Mandatory |
| 3 | Directorate of Treasuries, Pension & Entitlements Treasury Challan UK-DCL-30 |
Applicable only if there is any pending fees Whether payment made in right head, challan is of current financial year and the amount is as per prescribed fee Special Class Boiler manufacturer: S. N. Document Code Document Type Is Document Type Mandatory Issued By Document Name Is Docu ment Mand atory Comment Check points | Mandatory |
| 4 | Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 5 | Invoice - Raw Material ( Latest ) UK-DCL-161 |
Invoices of materials ment ioned in column titled “Document Name” Welding machine, Panel bending machine, Welding and Grinding equipment, Radila drilling machine, Chamfering machi ne, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 500kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) | Mandatory |
| 6 | Report (DPR, Technical, Financial ) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection ( MPI), Liquid Penetrant Inspecti on (LPI), Positive material Identification(PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 5 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certif | Mandatory |
| 7 | Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 8 | Invoice - Raw Material ( Latest ) UK-DCL-161 |
Invoices of materia ls mentioned in column titled “Document Name” above), Band saw cutting machine, Air compressor, Measuring tools) | Mandatory |
| 9 | Report (DPR, Technical, Financial) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI), Positive material Identification(PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 4 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certific | Mandatory |
| 10 | Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 11 | Invoice - Raw Material ( Latest ) UK-DCL-161 |
Invoices of materials menti oned in column titled “Document Name” Radial drilling machine, Chamfering machin e, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 200kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) | Mandatory |
| 12 | Report (DPR, Technical, Financial) UK-DCL-384 |
Reco gnized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or five years for Diploma Engineer(s), with experience Certificate of 3 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Ce | Mandatory |
| 13 | Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 14 | Invoice - Raw Material ( Latest ) UK-DCL-161 |
Invoices of materials mentioned in column titled “Document Name” | Mandatory |
| 15 | Report (DPR, Technical, Financial) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or four years for Diploma Engineer(s), with experience Certificate of 2 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Cer | Mandatory |
| 16 | Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 17 | Invoice - Raw Material ( Latest ) UK-DCL-161 |
Invoices of materials mentioned in column titled “Document Name” 3 Engineering Degree in relevant discipline or three years for Diploma Engineer(s), with experience Certificate of 1 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision Form | Mandatory |
Documents accepted on the portal
| Document | Type | Issued by | Required |
|---|---|---|---|
| Invoice - Raw Material ( Latest ) UK-DCL-161 | Miscellaneous Document | Self | Mandatory |
| Manufacturing Drawings UK-DCL-288 | Drawing / Maps | Self | Mandatory |
| Particulars of Materials, Design and Construction of Boilers UK-DCL-289 | Project Report ( with Investment and Product Details and Line Diagram) | Self | Mandatory |
| Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 | Miscellaneous Document | Self | Mandatory |
| Attachment for experience of the personnel employed UK-DCL-334 | Qualification Documents | Self | Mandatory |
More from Department of Labour
- Amendment of boiler manufacturer certificate
- Amendment of license of contractor under The Inter-State Migrant Workmen (RE&CS) Act, 1979
- Amendment of license under The Contract Labour Act, 1970
- Amendment of license under The Factories Act, 1948
- Amendment of registration of principal employer under The Contract Labour Act, 1970
- Amendment of registration of principal employer under The Inter-State Migrant Workmen (RE&CS) Act, 1979
- Amendment of Site plan approval under The Factories Act, 1948
- Amendment under The Dookan aur Vanijya Adhisthan Adhiniyam, 1962
- Amendment under The Motor Transport Workers Act, 1961
- Amendment under the The Indian Boilers Act, 1923 (Boiler & Economiser)
- Approval for boiler erector certificate
- Approval for draft standing order
