State approvals / Uttarakhand / Department of Labour
Amendment of boiler manufacturer certificate
DepartmentDepartment of Labour
TypeAmendment - Others
StagePre-Establishment, Pre-Operation
AppliedOnline
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Documents to submit
| # | Document | Department checks | Required |
|---|---|---|---|
| 1 | Self Manufacturing drawings (of works already carried out) UK-DCL-288 |
Whether previously approved drawings uploaded? | Mandatory |
| 2 | Self Particulars of Materials, Design and Construction of Boilers UK-DCL-289 |
Whether related approved paper uploaded? | Mandatory |
| 3 | Directorate of Treasuries, Pension & Entitlements Treasury Challan UK-DCL-30 |
Applicable only if there is any pending fees Whether payment made in right head, challan is of current financial year and the amount is as per prescribed fee Special Class Boiler manufacturer: S. N. Docu ment Code Document Type Is Document Type Mandatory Issued By Document Name Is Docu ment Mand atory Comment Check points | Mandatory |
| 4 | Self Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 5 | Self Invoice - Raw Material (Latest) (Invoice ( and photo if required) of UK-DCL-161 |
Invoices of materials menti oned in column titled “Document Name” Submerged Arc Welding machine for seam welding, Tungsten Inert Gas (TIG) Welding machine, Panel bending machine, Welding and Grinding equipment, Radila drilling machine, Chamfering machin e, tube bending machine, Tube swaging machine, Burners forpre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 500kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) | Mandatory |
| 6 | Report (DPR, Technical, Financial) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection ( MPI), Liquid Penetrant Inspection (LPI), Positive material Identification( PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 5 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certif | Mandatory |
| 7 | Self Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 5000 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 8 | Self Invoice - Raw Material (Latest) (Invoice ( and photo if required) of Submerged Arc Welding machine for seam welding, Tungsten Inert Gas ( TIG) Welding machine, Panel bending machine, Welding and Grinding equipment, Radila drilling machine, Chamfering machi ne, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 300 kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) UK-DCL-161 |
Invoices of materialsmen tioned in column titled “Document Name” | Mandatory |
| 9 | Report (DPR, Technical, Financial) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI), Positive material Identification (PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 4 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certifi | Mandatory |
| 10 | Self Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 3000 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 11 | Self Invoice - Raw Material (Latest) (Invoice (and photo if required) of Submerged Arc Welding machine for seam welding, Tungsten Inert Gas (TIG) Welding machine, Panel bending machine, Welding and Grinding equipment, Radial drilling machine, Chamfering machin e, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 200kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) UK-DCL-161 |
Invoices of materials menti oned in column titled “Document Name” | Mandatory |
| 12 | Report (DPR, Technical, Financial) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or five years for Diploma Engineer(s), with experience Certificate of 3 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Cer | Mandatory |
| 13 | Self Proof of covered area in square meters for manufacturing facility (at least 1500 sq. meters) UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 14 | Self Invoice - Raw Material (Latest) Invoice (and photo if required) of Tungsten Inert Gas (TIG) Welding machine, UK-DCL-161 |
Invoices of materials mentioned in column titled “Document Name” Welding and Grinding equipment, Radial drilling machine, Chamfering machine, tube bending machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic t est pump (up to 100 kgs/sq.cm or above), Band saw cutting machine, Air compressor, Measuring tools | Mandatory |
| 15 | Report (DPR, Technical, Financial) UK-DCL-384 |
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or four years for Diploma Engineer(s), with experience Certificate of 2 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Cer | Mandatory |
| 16 | Self Proof of adequate covered area in square meters for manufacturing facility UK-DCL-290 |
Documentary proof in this regard | Mandatory |
| 17 | Self Invoice - Raw Material (Latest) Invoice (and photo if required) of Plate bending machine (capacity up to 20mm thickness), Welding and Grinding equipment, Radial drilling machine, Hydraulic test pump( up to 50 kgs/sq.cm or above), Tube expander, lathe machine, Power hacksaw, drill machine, Measuring tools UK-DCL-161 |
Invoices of materials mentioned in column titled “Document Name” 3 Engineering Degree in relevant discipline or three years for Diploma Engineer(s), with experience Certificate of 1 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision | Mandatory |
More from Department of Labour
- Amendment of license of contractor under The Inter-State Migrant Workmen (RE&CS) Act, 1979
- Amendment of license under The Contract Labour Act, 1970
- Amendment of license under The Factories Act, 1948
- Amendment of registration of principal employer under The Contract Labour Act, 1970
- Amendment of registration of principal employer under The Inter-State Migrant Workmen (RE&CS) Act, 1979
- Amendment of Site plan approval under The Factories Act, 1948
- Amendment under The Dookan aur Vanijya Adhisthan Adhiniyam, 1962
- Amendment under The Motor Transport Workers Act, 1961
- Amendment under the The Indian Boilers Act, 1923 (Boiler & Economiser)
- Approval for boiler erector certificate
- Approval for boiler manufacturer certificate
- Approval for draft standing order