Insights into Company Bills & Payments

State approvals / Uttarakhand / Department of Labour

Amendment of boiler manufacturer certificate

DepartmentDepartment of Labour
TypeAmendment - Others
StagePre-Establishment, Pre-Operation
AppliedOnline
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Documents to submit

#DocumentDepartment checksRequired
1 Self Manufacturing drawings (of works already carried out)
UK-DCL-288
Whether previously approved drawings uploaded? Mandatory
2 Self Particulars of Materials, Design and Construction of Boilers
UK-DCL-289
Whether related approved paper uploaded? Mandatory
3 Directorate of Treasuries, Pension & Entitlements Treasury Challan
UK-DCL-30
Applicable only if there is any pending fees Whether payment made in right head, challan is of current financial year and the amount is as per prescribed fee Special Class Boiler manufacturer: S. N. Docu ment Code Document Type Is Document Type Mandatory Issued By Document Name Is Docu ment Mand atory Comment Check points Mandatory
4 Self Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 7500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
5 Self Invoice - Raw Material (Latest) (Invoice ( and photo if required) of
UK-DCL-161
Invoices of materials menti oned in column titled “Document Name” Submerged Arc Welding machine for seam welding, Tungsten Inert Gas (TIG) Welding machine, Panel bending machine, Welding and Grinding equipment, Radila drilling machine, Chamfering machin e, tube bending machine, Tube swaging machine, Burners forpre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 500kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools) Mandatory
6 Report (DPR, Technical, Financial)
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection ( MPI), Liquid Penetrant Inspection (LPI), Positive material Identification( PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 5 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certif Mandatory
7 Self Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 5000 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
8 Self Invoice - Raw Material (Latest) (Invoice ( and photo if required) of Submerged Arc Welding machine for seam welding, Tungsten Inert Gas ( TIG) Welding machine, Panel bending machine, Welding and Grinding equipment, Radila drilling machine, Chamfering machi ne, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 300 kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools)
UK-DCL-161
Invoices of materialsmen tioned in column titled “Document Name” Mandatory
9 Report (DPR, Technical, Financial)
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI), Positive material Identification (PMI) facility, Universal Testing machine (UTM), Radiographic Testing (RT), Ultrasonic Testing (UT) ) 4 Engineering Degree in relevant discipline, Experience Certificate of 4 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certifi Mandatory
10 Self Proof of Covered Area (in sq. mts.) for Manufacturing Facility (at least 3000 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
11 Self Invoice - Raw Material (Latest) (Invoice (and photo if required) of Submerged Arc Welding machine for seam welding, Tungsten Inert Gas (TIG) Welding machine, Panel bending machine, Welding and Grinding equipment, Radial drilling machine, Chamfering machin e, tube bending machine, Tube swaging machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic test pump( upto 200kgs/sqcm or above), Band saw cutting machine, Air compressor, Measuring tools)
UK-DCL-161
Invoices of materials menti oned in column titled “Document Name” Mandatory
12 Report (DPR, Technical, Financial)
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or five years for Diploma Engineer(s), with experience Certificate of 3 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Cer Mandatory
13 Self Proof of covered area in square meters for manufacturing facility (at least 1500 sq. meters)
UK-DCL-290
Documentary proof in this regard Mandatory
14 Self Invoice - Raw Material (Latest) Invoice (and photo if required) of Tungsten Inert Gas (TIG) Welding machine,
UK-DCL-161
Invoices of materials mentioned in column titled “Document Name” Welding and Grinding equipment, Radial drilling machine, Chamfering machine, tube bending machine, Burners for pre-heating and post heating, heat treatment facilities, Hydraulic t est pump (up to 100 kgs/sq.cm or above), Band saw cutting machine, Air compressor, Measuring tools Mandatory
15 Report (DPR, Technical, Financial)
UK-DCL-384
Recognized by GoI Test Report of Products from Notified Laboratory ( Inspection or testing reports of Magnetic particle inspection (MPI), Liquid Penetrant Inspection (LPI) ) 4 Engineering Degree in relevant discipline or four years for Diploma Engineer(s), with experience Certificate of 2 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision 5 Certificates of Non - Destructive Testing (NDT) personnel with Level - II Non Destructive Test Cer Mandatory
16 Self Proof of adequate covered area in square meters for manufacturing facility
UK-DCL-290
Documentary proof in this regard Mandatory
17 Self Invoice - Raw Material (Latest) Invoice (and photo if required) of Plate bending machine (capacity up to 20mm thickness), Welding and Grinding equipment, Radial drilling machine, Hydraulic test pump( up to 50 kgs/sq.cm or above), Tube expander, lathe machine, Power hacksaw, drill machine, Measuring tools
UK-DCL-161
Invoices of materials mentioned in column titled “Document Name” 3 Engineering Degree in relevant discipline or three years for Diploma Engineer(s), with experience Certificate of 1 years in field of Boilers, Experience Certificate of engineer(s) with erection, commissioning and supervision Mandatory

More from Department of Labour