State approvals / Uttarakhand / Department of Labour
Approval for boiler erector certificate
DepartmentDepartment of Labour
TypeApproval
StagePre-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categorylow
Investor typeForeign, Domestic
Documents to submit
| # | Document | Department checks | Required |
|---|---|---|---|
| 1 | Self Manufacturing drawings (of works already carried out) UK-DCL-288 |
Whether previously approved drawings uploaded? | Mandatory |
| 2 | Self Particulars of Materials, Design and Construction of Boilers UK-DCL-289 |
Whether related approved paper uploaded? | Mandatory |
| 3 | Directorate of Treasuries, Pension & Entitlements Treasury Challan UK-DCL-30 |
Applicable only if there is any pending fees Whether payment made in right head, challan is of current financial year and the amount is as per prescribed fee Class - I Boiler Manufacture: S. N. Docu ment Code Document Type Is Document Type Mandatory Issued By Document Name Is Document Mandatory Comment Check points 1 Degree in mechanical or Production or Power Plant or Metallurgical engineering of owner or permanently employed engineer on its rolls with at least 5 years of experience in an organ | Mandatory |
Documents accepted on the portal
| Document | Type | Issued by | Required |
|---|---|---|---|
| Aadhar Card UK-DCL-1 One Permanent Address Proof is mandatory | Address Proof | Unique Identification Authority of India | If applicable |
| Election Voter ID Card UK-DCL-3 One Permanent Address Proof is mandatory | Address Proof | Election Commission of India | If applicable |
| Passport UK-DCL-4 One Permanent Address Proof is mandatory | Address Proof | Consular, Passport & Visa Division - Ministry of External Affairs | If applicable |
| Existing Certificate of Boiler Erector UK-DCL-335 | State Government- Certificate | Department of Labour | Optional |
| Year of Establishment - Proof UK-DCL-314 | Miscellaneous Document | Self | Mandatory |
| Type of jobs executed by the firm earlier, with special reference to their maximum working pressure, temperature and the materials involved, with documentary evidence UK-DCL-328 | Miscellaneous Document | Self | Mandatory |
| Attachment for detailed list of technical personnel with Xerox copy of the Welders current certificate issued under the Regulations who are permanently employed with the firm UK-DCL-330 | Miscellaneous Document | Self | Mandatory |
| Attachment if the firm is prepared to execute the job strictly in confirmity with the regulations and maintain a high standard of work UK-DCL-331 | Miscellaneous Document | Self | Optional |
| Attachment if the firm has an internal quality control system of their own UK-DCL-332 | Miscellaneous Document | Self | Optional |
| Attachment for Qualification of the personnel employed UK-DCL-333 | Qualification Documents | Self | Mandatory |
| Attachment for experience of the personnel employed UK-DCL-334 | Qualification Documents | Self | Mandatory |
| Attachment if the firm has ever been approved by any Boiler' Directorate/ Inspectorate UK-DCL-329 | State Government - Clearance | — | Optional |
More from Department of Labour
- Amendment of boiler manufacturer certificate
- Amendment of license of contractor under The Inter-State Migrant Workmen (RE&CS) Act, 1979
- Amendment of license under The Contract Labour Act, 1970
- Amendment of license under The Factories Act, 1948
- Amendment of registration of principal employer under The Contract Labour Act, 1970
- Amendment of registration of principal employer under The Inter-State Migrant Workmen (RE&CS) Act, 1979
- Amendment of Site plan approval under The Factories Act, 1948
- Amendment under The Dookan aur Vanijya Adhisthan Adhiniyam, 1962
- Amendment under The Motor Transport Workers Act, 1961
- Amendment under the The Indian Boilers Act, 1923 (Boiler & Economiser)
- Approval for boiler manufacturer certificate
- Approval for draft standing order