Application for approval of CEI prior to energization of electrical installation for voltage greater than 650V (Regulation 43)

DepartmentElectrical Inspectorate
TypeApproval
StagePre-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Documents to submit

#DocumentConditionRequired
1 Load Sanction Letter Mandatory In case of connection is from Discoms If applicable
2 Load List In case of items are more than 50 nos. N 4 Manufacturer’s test certificates of the equipment Mandatory
3 Challan of inspection fees Based on rate/ charges chart Y 6 Completion certificate from a licenced electrical contractor Y 7 Invoices/ Bills of the equipments Mandatory

Documents accepted on the portal

DocumentTypeIssued byRequired
Sanction letter of Power load from Electric Department
UK-DCL-325
State Government - ApprovalUttarakhand Power Corporation LimitedOptional
Drawing approved by CEIG/ reference no. of DAC
UK-DCL-411
Drawing / MapsElectrical InspectorateOptional
List of load
UK-DCL-417
Load ListSelfOptional
Completion certificate from a licenced electrical contractor
UK-DCL-419
Completion Certificate—Mandatory
Invoices/ Bills of the equipments
UK-DCL-418
Challan / FeeBank(s)Mandatory
Manufacturers test certificates of the equipment
UK-DCL-420
Manufacturer's CertificateSelfMandatory
Challan of inspection fees
UK-DCL-414
Challan / FeeElectrical InspectorateMandatory