Approval of Temporary electrical installations under Section 54
DepartmentElectrical Inspectorate
TypeApproval
StagePre-Establishment, Post-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Document checklistApplication formFee structureProcedure (SOP)TimelinesInspection checklist Apply on Invest Uttarakhand (SWCS)
Requirements
- # Document Name Condition Mandatory Y/N 1 Load Sanction letter Mandatory in case applied for connection from Discom N 2 Completion certificate from a licenced electrical contractor Y 3 Load List (In case of items are) more than 50 nos. N 4 Challan of inspection fees Based on rate/ charges chart Y 5 Drawing of electrical installation Mandatory (In case of HV/EHV equipment) N 6 Manufacturer’s test certificates of the equipment Mandatory (In case of HV/EHV equipment) N 7 I nvoices/ Bills of the equipment Mandatory (In case of HV/EHV equipment) Y For NOC validity in format Letterhead Heading changes as per jurisdiction as per 3 areas – DDN, HLD, RKR
Documents accepted on the portal
| Document | Type | Issued by | Required |
|---|---|---|---|
| Sanction letter of Power load from Electric Department UK-DCL-325 | State Government - Approval | Uttarakhand Power Corporation Limited | Optional |
| Challan of inspection fees UK-DCL-414 | Challan / Fee | Electrical Inspectorate | Mandatory |
| Drawing of electrical installation UK-DCL-415 | Drawing / Maps | — | Optional |
| Completion certificate from a licenced electrical contractor UK-DCL-419 | Completion Certificate | — | Mandatory |
| Invoices/ Bills of the equipments UK-DCL-418 | Challan / Fee | Bank(s) | Mandatory |
| List of load UK-DCL-417 | Load List | Self | Optional |
| Manufacturers test certificates of the equipment UK-DCL-420 | Manufacturer's Certificate | Self | Optional |
More from Electrical Inspectorate
- Application for approval of CEI prior to energization of electrical installation for voltage greater than 650V (Regulation 43)
- Application for examination of workman permit
- Application for inspection and testing of consumer's / owner's LT installation
- Application for testing meters of any description
- Approval for installation of passenger lift and lift shaft and machine room
- Approval of drawing, map, plan and sections as per sec. 53 (f) of The Electricity Act, 2003
- Approval of drawing, map, plan and sections as per sec. 53 (f) of The Electricity Act, 2003’ under regulation 32 (Generator Set)
- Approval of electrical installations of Generating Sets under regulation 32
- Certificate of competency -supervisors class A
- Certificate of competency -supervisors class B
- Certificate of workman permit class A
- Certificate of workman permit class B