State approvals / Uttarakhand / Electrical Inspectorate
Approval of electrical installations of Generating Sets under regulation 32
DepartmentElectrical Inspectorate
TypeApproval
StagePre-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic
Document checklistApplication formFee structureProcedure (SOP)TimelinesInspection checklist Apply on Invest Uttarakhand (SWCS)
Documents to submit
| # | Document | Condition | Required |
|---|---|---|---|
| 1 | 2 years for voltage above 650 V | — | Required |
| 2 | 3 years for voltage upto 650 V | — | Required |
- # Document Name Condition Mandatory Y/N 1 Drawing approved by CEIG/ reference no. of DAC Y 2 Manufacturer’s test certificates of the equipment Y 3 Challan of inspection fees Based on rate/ charges chart Y 4 Completion certificate from a licenced electrical contractor Y 5 Invoices/ Bills of the equipment Y For NOC validity in format
Documents accepted on the portal
| Document | Type | Issued by | Required |
|---|---|---|---|
| Drawing approved by CEIG/ reference no. of DAC UK-DCL-411 | Drawing / Maps | Electrical Inspectorate | Mandatory |
| Completion certificate from a licenced electrical contractor UK-DCL-419 | Completion Certificate | — | Mandatory |
| Invoices/ Bills of the equipments UK-DCL-418 | Challan / Fee | Bank(s) | Mandatory |
| Manufacturers test certificates of the equipment UK-DCL-420 | Manufacturer's Certificate | Self | Mandatory |
| Challan of inspection fees UK-DCL-414 | Challan / Fee | Electrical Inspectorate | Mandatory |
More from Electrical Inspectorate
- Application for approval of CEI prior to energization of electrical installation for voltage greater than 650V (Regulation 43)
- Application for examination of workman permit
- Application for inspection and testing of consumer's / owner's LT installation
- Application for testing meters of any description
- Approval for installation of passenger lift and lift shaft and machine room
- Approval of drawing, map, plan and sections as per sec. 53 (f) of The Electricity Act, 2003
- Approval of drawing, map, plan and sections as per sec. 53 (f) of The Electricity Act, 2003’ under regulation 32 (Generator Set)
- Approval of Temporary electrical installations under Section 54
- Certificate of competency -supervisors class A
- Certificate of competency -supervisors class B
- Certificate of workman permit class A
- Certificate of workman permit class B