Insights into Company Bills & Payments

State approvals / Uttarakhand / Electrical Inspectorate

Testing of temporary connection

DepartmentElectrical Inspectorate
TypeApproval
StagePre-Establishment
AppliedOnline
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Requirements

  • # Document Name Condition Mandatory Y/N 1 Load Sanction letter Mandatory in case applied for connection from Discom N 2 Completion certificate from a licenced electrical contractor Y 3 Load List (In case of items are) more than 50 nos. N 4 Challan of inspection fees Based on rate/ charges chart Y 5 Drawing of electrical installation Mandatory (In case of HV/EHV equipment) N 6 Manufacturer’s test certificates of the equipment Mandatory (In case of HV/EHV equipment) N 7 I nvoices/ Bills of the equipment Mandatory (In case of HV/EHV equipment) Y For NOC validity in format Letterhead Heading changes as per jurisdiction as per 3 areas – DDN, HLD, RKR

More from Electrical Inspectorate