Insights into Company Bills & Payments

State approvals / Uttarakhand / Electrical Inspectorate

Retesting of Temporary electrical installations under Section 54

DepartmentElectrical Inspectorate
TypeAmendment - Others
StagePre-Establishment, Post-Operation
AppliedIntegrated With SWCS
Unit sizeMicro, Small, Medium, Large, Mega, Ultra-Mega, Super Ultra-Mega
Business locationUrban-Plain, Urban-Hilly, Rural-Plain, Rural-Hilly
Risk / pollution categoryHigh, Medium, Low, Red, Orange, Green, White
Investor typeForeign, Domestic

Requirements

  • # Document Name Condition Mandatory Y/N 1 Load Sanction letter Mandatory in case applied for connection from Discom N 2 Completion certificate from a licenced electrical contractor Y 3 Load List (In case of items are) more than 50 nos. N 4 Challan of inspection fees Based on rate/ charges chart Y 5 Drawing of electrical installation Mandatory (In case of HV/EHV equipment) N 6 Manufacturer’s test certificates of the equipment Mandatory (In case of HV/EHV equipment) N 7 I nvoices/ Bills of the equipment Mandatory (In case of HV/EHV equipment) Y For NOC validity in format Letterhead Heading changes as per jurisdiction as per 3 areas – DDN, HLD, RKR

Documents accepted on the portal

DocumentTypeIssued byRequired
Sanction letter of Power load from Electric Department
UK-DCL-325
State Government - ApprovalUttarakhand Power Corporation LimitedOptional
Challan of inspection fees
UK-DCL-414
Challan / FeeElectrical InspectorateMandatory
Drawing of electrical installation
UK-DCL-415
Drawing / Maps—Mandatory
Completion certificate from a licenced electrical contractor
UK-DCL-419
Completion Certificate—Mandatory
Invoices/ Bills of the equipments
UK-DCL-418
Challan / FeeBank(s)Optional
List of load
UK-DCL-417
Load ListSelfOptional
Manufacturers test certificates of the equipment
UK-DCL-420
Manufacturer's CertificateSelfOptional